Friday, April 22, 2011

Sketch(up)s V01!

So before we start building, we need to do a few things:

Step 1 - Figure out what we are going to build.
Step 2 - Buy/borrow/acquire what we need to build the wall.
Step 3 - Find somewhere to build it.
Step 4 - Start building.
Step 5 - Complete build ready for testing.


For now we are looking at Step 1.

VERSION 01

First sketch(up) of the wall done with focus on keeping the wall as simple as possible. Earthbag core with render on one side and plasterboard on the other.


Profile depth - 300mm.

Thoughts - I think we need to add something at the back to ensure that if the earthbag gets wet that it doesn't transfer directly to the plasterboard.  Like a foil?  And structurally i think it will probably start to sink a bit if we don't fix it to something but what?

5 comments:

  1. I agree with the idea of putting some kind of material between the bags and the plasterboard. foam board might help as membrane and also work as insulation maybe??

    ReplyDelete
  2. Yeah something new at the back sounds like a plan, i'll do up another version this afternoon and post it, see what you guys think.

    ReplyDelete
  3. yes, I agree.

    Probably, need to design an air gap.

    ReplyDelete
  4. Yeah we can possibly look at a brick veneer type construction with a stud frame that the bags can tie to. This would also allow for the air gap to prevent the moisture from getting through.

    ReplyDelete
  5. Ok, I've got a V02 up now. Taken into consideration what you guys have said, think we are heading in the right direction.

    ReplyDelete